Documents
Culver City Bicycle & Pedestrian Master Plan (11.1.10)
Attachment 1 - Design Guidelines
Environmental Documents
Proposed Negative Declaration
Intent to Adopt a Negative Declaration
Previous Draft
Culver City Bicycle and Pedestrian Master Plan - DRAFT (5.28.10)
Documents from the June 12th Workshop
- Presentation
- Programs Board 1
- Programs Board 2
- Project Prioritization Ranking
- Recommendations
- 6.12. Minutes
Documents from the January 30th Workshop
Maps Marked with Public Comment
Network Documents
Materials from the 4/4 Workshop
Materials from the 7/25 Workshop
- July 25 Workshop Minutes
- July 25 Workshop Presentation
- Area Priority Sheet
- Policy Priority Sheet
- Needs Analysis
- Existing Conditions Report
Materials from the 10/3 Workshop
- Proposed Bicycle Network Map
- Proposed Pedestrian Network Map
- Downtown - Expo Route Cross Section
- Downtown - Expo Route Wayfinding
- October 3 Presentation
- October 3rd Flyer
Supplemental Information
- Culver City Bicycle & Pedestrian Linkages Initiative Presentation (PDF)
- Metro Expo Line Fact Sheet (PDF)
- Metro Expo Line Map (PDF)
The following picture set captures the public feedback from the October 3rd workshop.


